How to construct the lighting project

2021-11-24
The lighting project construction actually started before entering the site. The earliest should be in the design stage. When the designer is carrying out the lighting design, the project manager and engineer should participate in it, inspect the construction preparation work on the site, and carry out the on-site environment, the installation location of the lamps and the location of the distribution box. Understand and put forward reasonable opinions and suggestions for lighting designers. When estimating, provide relevant data such as construction volume and cable quantity to the budget department in order to make the budget as close to reasonable as possible. In the in-depth design, it is necessary to communicate with the lighting manufacturers to make the installation more reasonable, and even customize the lamps or installation methods according to the actual conditions of the building and the landscape.
1
After the contract is signed, the site must be inspected in more depth and detail. For various reasons, the construction may not be fully investigated during the lighting design, but the lighting project is about to be implemented before entering the site, and the preparatory work before entering the site must be completed in more depth and detail.
2020 Jd15
When the lighting project starts construction, the construction organization design should be done well. The construction team must be prepared and ready to enter the site. It is necessary to do the laying of pipelines first, while preparing for the production of lamps and control systems such as distribution boxes. After the pipeline is laid, the lamps and lanterns should enter the site. This is the most important task. Not only should the installation be paid attention to, but also the angle and position of the lamps and lanterns, so that the lighting effect can reach a satisfactory level. Pay attention to safety, especially the safety of spider-men working at heights. Safety cannot be overemphasized. In this process, we must pay attention to the construction period. The construction must be carried out in strict accordance with the time planned by the construction organization. No special circumstances must not delay the construction period. After the installation is complete, it is the debugging stage. After the commissioning is satisfied, the Lianghua Engineering Company shall first carry out internal inspection and acceptance, and then ask Party A for acceptance after passing the test. After passing the acceptance, we must cooperate with the company to complete the project acceptance procedures and urge the project progress payment, and then after-sales maintenance will be the content.
Related Products List

Home

Product

Whatsapp

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send